We – EPG Team the bigge EPT Chain and agricultural gearbox manufacturing facility in China with 5 distinct branches. For more information: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
C45 Carbon Steel Top quality DIN6 laser equipment Equipment Rack
one. Description
The company owns the world’s leading processing gear, specialized in the manufacturing of substantial precision grinding equipment rack.The precision of grinding tooth rack can attain the German standard DIN3962 of degree 5. The module m1-m22 and the duration can achieve 2.5 meters.
2. People
Large precision:Feed precision and positioning precision approximate the precision of the screw. |
Reduced sounds and vibration:No uncomfortable tapping and rolling sound when substantial precision grinding gear rack meshing. |
Prolonged length and higher speed can be understood: extended distance transmission can be recognized, and high-pace movement over 200m/min can be carried out. |
High bearing ability: the max allowable bearing capacity of high precision grinding equipment rack is about 2-3 times than precision milling rack. |
3. Complex Knowledge
Code | Module | L | L2 | Tooth No. | B | A0 | A1 | D | I | Hole No. | A | C1 | C2 | E | D1 | I1 | C3 | ||
CHTGH | 571 | 05 | one | five hundred.00 | 3.14 | a hundred and fifty | fifteen | 15 | 14 | – | – | – | – | – | – | – | – | – | – |
CHTGH | 015 | OS | 1.five | five hundred.00 | 6.7 | 100 | 19 | 19 | seventeen.S | sixty two.50 | 125 | four | 8 | seven | eleven | 7 | 31.seven | 436.six | 5.7 |
CHTGH | 015 | ten | 1.5 | a thousand.00 | 6.seven | two hundred | 19 | 19 | seventeen.5 | 62.50 | a hundred twenty five | eight | 8 | seven | eleven | 7 | 31.7 | 936.six | 5.seven |
CHTGH | 571 | 05 | 2 | five hundred.00 | 8.five | 75 | 24 | 24 | 22 | 62.fifty | one hundred twenty five | 4 | eight | 7 | 11 | seven | 31.7 | 436.six | 5.7 |
CHTGH | 571 | ten | 2 | a thousand.00 | 8.five | 150 | 24 | 24 | 22 | sixty two.50 | a hundred twenty five | 8 | eight | seven | eleven | seven | 31.7 | 936.6 | five.seven |
CHTGH | 030 | 05 | three | 500.00 | ten.3 | fifty | 29 | 29 | 26 | 62.50 | one hundred twenty five | four | nine | ten | 15 | 9 | 35. | 430. | seven.seven |
CHTGH | 030 | ten | 3 | a thousand.00 | ten.three | 100 | 29 | 29 | 26 | 62.50 | a hundred twenty five | eight | 9 | 10 | 15 | nine | 35. | 930. | seven.seven |
CHTGH | 040 | 05 | 4 | 506.67 | 13.8 | 38 | 39 | 39 | 35 | 62.fifty | one hundred twenty five | four | 12 | ten | fifteen | nine | 33.3 | 433. | seven.seven |
CHTGH | 040 | 10 | 4 | 1000.00 | 13.eight | 75 | 39 | 39 | 35 | sixty two.50 | one hundred twenty five | 8 | twelve | 10 | fifteen | 9 | 33.three | 933.4 | seven.seven |
CHTGH | 050 | 05 | 5 | five hundred.00 | seventeen.four | 30 | 49 | 39 | 34 | sixty two.fifty | 125 | 4 | 12 | 14 | twenty | 13 | 37.five | 425. | eleven.7 |
CHTGH | 050 | 10 | 5 | 1000.00 | seventeen.4 | 60 | 49 | 39 | 34 | 62.fifty | a hundred twenty five | eight | twelve | fourteen | 20 | thirteen | 37.five | 925. | 11.7 |
CHTGH | 060 | 05 | 6 | five hundred.00 | 20.9 | twenty five | 59 | forty nine | forty three | 62.fifty | one hundred twenty five | 4 | sixteen | 18 | 26 | seventeen | 37.five | 425. | 15.seven |
CHTGH | 060 | ten | six | 1000.00 | 20.9 | fifty | 59 | forty nine | forty three | 62.50 | 125 | eight | 16 | 18 | 26 | 17 | 37.5 | 925. | 15.seven |
CHTGH | 080 | 05 | eight | 480.00 | 28. | 18 | 79 | seventy nine | 71 | 60.00 | 120 | 4 | 25 | 22 | 33 | 21 | one hundred twenty. | 240. | 19.7 |
CHTGH | 080 | 10 | eight | 960.00 | 28. | 36 | 79 | 79 | seventy one | sixty.00 | 120 | 8 | twenty five | 22 | 33 | 21 | 120. | 720. | 19.7 |
CHTGH | a hundred | ten | ten | one thousand.00 | 35.11 | thirty | 99 | ninety nine | 89 | 62.fifty | 125 | 8 | 32 | 33 | 48 | 32 | one hundred twenty five. | 750. | I 19.seven |
CHTGH | one hundred twenty | 10 | twelve | a thousand.00 | 42.56 | twenty five | one hundred twenty | a hundred and twenty | 108 | forty.00 | a hundred twenty five | 8 | 40 | 39 | 58 | 38 | 125. | 750. | 19.7 |
4. photos
5. Get process
a. Customer sends us the drawing or sample, If only sample, our organization source the C EPT drawing.
b. Our firm supplies the processing technique and quotation.
c. Our firm provides the sample after buyer verified processing approach and quotation.
d. Customer areas the order after validate the sample.
e. Customer pay out 50% deposit
f. Quantity manufacturing.
g. Spend the harmony after the acceptance and confirmation.
h. Shipping.
The use of original tools manufacturer’s (OEM) part numbers or trademarks , e.g. CASE® and John Deere® are for reference needs only and for indicating item use and compatibility. Our company and the outlined substitution elements contained herein are not sponsored, authorized, or created by the OEM.